Reimann Manufacturing – Workshop Extension

Reimann Manufacturing’s increasing workload brought about the need for an extension to their existing workshop. The extension consisted of an additional workspace structure of 25 metres long x 16.45 metres wide and 9 metres high.

The structure contained heavy duty columns and universal beam rafters, all sandblasted and painted in Red Oxide to match the existing structure. It included substantial footings to allow for overhead cranes and crane beams were tied into the existing structure.

Site works were carried out without major disruptions to the client’s production and the client was impressed with the quality of the completed structure.

“They did a great job tying the new extension into the 40-year-old workshop”.